Millennium town
General information
Location
Mongolia, Ulaanbaatar city, Songinokhairkhan district, 1st khoroo, Bayangoliin am, in the left side of central road along Nairamdal camp, 17kms from central point of Ulaanbaatar city
Total area:
91 hectare
Land for sale:
10 hectare
APPROVED GENERAL PLAN FOR THE MILLENNIUM TOWN
ESTIMATIONS FOR URBAN CONSTRUCTION
Type of assessments | Results |
Assessment of natural and ecological factors | Well suitable |
Assessment of social and economical factors | Good – high |
Assessment of architectural, space planning and landscape factors | Well suitable |
General assessment | Good |
INFRASTRUCTURE
• Heating
The installation works for 5.5 kms from the 7.9kms of heating lines, which is continued from the Power plant #4 to the project area, was performed with 90% and this work will be completely finished and heating supplement will be open after there will be created first consumers and after State commission receives the installation work. “Heating sub-station with water boilers” will be installed plus to the heating sources and investments for it were already resolved. So, heating supplement at the area of Bayangoliin am is ready to be connected to the centralized heating system.
• Clean water
The following works were executed during 2005-2009 and clean water lines will be immediately used after first consumer uses it;
- Central magistral lines, which has diameters 300-600mm valued 6.2 billion MNT continued from the right water transmission center in 1st micro-region to Orbit station and to Bayangoliin am, for supplying Bayangoliin am with clean water;
- Elevating pump station;
- Two water reservoirs;
The following works were executed during 2005-2009 and clean water lines will be immediately used after first consumer uses it;
- Central magistral lines, which has diameters 300-600mm valued 6.2 billion MNT continued from the right water transmission center in 1st micro-region to Orbit station and to Bayangoliin am, for supplying Bayangoliin am with clean water;
- Elevating pump station;
- Two water reservoirs;
• Dirty water lines
During 2005-2009, the work to install dirty water magistral lines, which has diameters 200-600mm and length of 7.2km from the Ulaanbaatar city’s central cleaning construction, was performed till project area. It will be immediately used after the first consumer uses;
Central heating system
The resolution to finance from the Capital’s budget the works to set up the sub-station 110/35/10Kw with air lines for transmitting electricity, which will supply the areas at Bayangoliin am with electricity, was drawn by the Authorities and land issuance, project and draft works were already started in 2010.
In this year, the “Moscow Complex” LLC will start the works to stretch electricity lines for supplying town
• Roads
The project area was connected with the city’s centre with asphalt road and road quality is sufficiently good to 5 shar bus stop. From 5 shar bus stop to Orbit direction, road quality is not so good. Road renovating construction will be and is being made in this year. Road from the Tolgoit-Orbit junction to Orbit will be renovated till 2012. So, road quality to the direction of Millennium town will be completely renovated further.
• Internet, cable connections and communication
This work became a business branch, which is aimed to gain profit. So, it will be resolved without any difficulties by offering to the executor companies.
AIR POLLUTION
In the project area no any chemical, biological and raw materials processing factories due to no any bad smell here. There are no any sources or soil erosions, which cause dusts, due to no dust in the project area.
Earthquake activeness
• The Bayangoliin am or project area is included in the earthquake activeness that has 7 grades;
• Soil water was not revealed in the depth 10-15m;
• In ecologically, soil is in same condition with Ulaanbaatar city; Soil freeze depth is 2.8-3.6m; soil is possible to create lower grade knob below medium in winter season;
• This area was not touched to human engineering actions, so the area keeps it’s natural form and is very suitable to set up new town or residential region here.
SOCIAL CARE SERVICES
However this service is rendered by the state but the secondary school, which will involve 1800 children, was planned to be built at the project area with the assistance of JICA in order to satisfy residents’ rights. Also the private schools can be founded because of there will be created areas for sales and services. Of course, number of schools will be multiplied with the increase of population. Actions will be conducted in accordance with Concession law.
• Services
Shops and other service areas were planned on the town building and these will be a channel to gain profit.
• Public transportation
At present public transportation means serve close to 2kms to the project area. Bus stop will be extended till Millennium town after it will be completely put into operation.
Shops and other service areas were planned on the town building and these will be a channel to gain profit.
• Public transportation
At present public transportation means serve close to 2kms to the project area. Bus stop will be extended till Millennium town after it will be completely put into operation.